Revit → IFC → 4D Illustrative schedule · Oct 2026 — May 2027
SIMULATION DATE
Fictional eight-month planning study, not a construction programme. Model links use IFC element type, name and level; verify before project use. Terrain and excavation are illustrative; backfill restores ground cover around the foundation. Preconstruction, rough-in and handover have no separate IFC geometry. Click a task to jump to its start; drag the timeline to review construction.